Elijah House Academy Ribbon Cutting

This article was posted on November 17, 2023

We are excited to show off the 12,000 SF Multi-Purpose Center we just completed for Elijah House Academy. This Project included a gym, stage, locker rooms, classrooms, office space, storage space, soccer field, quad, and new parking lot. This building is composed of a Butler Pre-Engineered Metal Building structure for the large volume space with conventional masonry and steel construction for the lower volume spaces. Both structures are wrapped with brick veneer.

 

Click the “Learn More” button below to watch a great video of the Ribbon Cutting Ceremony!

 

Cristo Rey Richmond High School – Phase 2C

This article was posted on October 27, 2023

We recently completed the 4th construction phase at Cristo Rey. This 12,000 SF  latest phase included renovation of existing connector building including a main entrance addition, new elevator, administration space, offices, a learning commons space, and a classroom. It was a challenge to work between 2 other existing buildings that were occupied by the active school and that were built in different decades. The renovated connector building has 6 different finished floor elevations that tie the 2 other existing buildings together.

Vertical Indoor Farm

This article was posted on October 1, 2023

We are suppling and erecting the PEMB and wall panels on conventional steel building for  the world’s largest vertical indoor farm project. This 27,500 SF Butler Pre-Engineered Metal Building has a 150′ clearspan!

Blueprint Automation

This article was posted on August 1, 2023

Things are moving along on the 60,000 SF Butler Pre-Engineered Metal Building manufacturing addition.

Weidmüller Manufacturing Expansion

This article was posted on May 18, 2023

We are underway at Weidmüller with their 24,000SF manufacturing expansion. The structure will be a Butler Pre-Engineered Metal Building with masonry walls.

60th Anniversary

This article was posted on April 28, 2023

 

Greene Hollowell started Century in 1963. This April we celebrated 60 years of building!

Elijah House Academy – Site Tours

This article was posted on February 1, 2023

 

It’s special when we get to share the building process with the students that will use the finish product.

St. Mary’s Catholic School

This article was posted on December 1, 2022

 

 

 

Gym, Kitchen, and Courtyard Transformations for St. Mary’s Catholic School.

Completed over 50,000 SF demo and new build for Publix

This article was posted on May 29, 2019

Publix Super Markets at Westpark Sopping Center on Broad St is open! This was a complete demo and rebuild project. We completed the project on schedule even with the extreme amounts of precipitation over the last year. Here is a time-lapse video of the project.

100,000sf Industrial Metal Building

This article was posted on May 15, 2019

Check out the progress at M.C. Dean. We are building out the existing 100,000sf steel structure to make an enclosed industrial space.

 

NAWIC “LOVE” sign built at Reynolds Community College

This article was posted on May 8, 2019

The Richmond Chapter of NAWIC (National Association of Women in Construction) built an awesome “LOVE” sign at J Sargeant Reynolds Community College Parham Campus. Our very own Candy Cecil (fifth from the left) helped make the sign a reality! It was made from various materials highlighting different building trades. 

NAWIC

Ground Breaking at Christ the King Lutheran Church!

This article was posted on April 17, 2019

We have a busy spring/summer planned with many new projects starting up. We were honored to be invited to the ground breaking ceremony at Christ the King Lutheran Church over the weekend and are excited to complete this education addition with them over the next few months.